Projects : Power Cables : Mull - France - Jersey - Guernsey Power Link

   
     
Five Oceans Services was awarded the contract for the installation of two High Voltage Alternating Current (HVAC) and two Fiber Optic (FO) cables between the French mainland at St. Remy and Guernsey via Jersey by ABB High Voltage Cables. The total installed cable length was approximately 45.0 km.

The installations comprised cable lay between the joint locations on both islands and the mainland and subsequently trenching of the cables to a minimum depth of 1.0 m below the seabed, where possible. Cable lay was carried out by Five Oceans Services' dedicated cable lay vessel Sea Spider, whereas the trenching of the cables was carried out using the Smartjet 1150. In order to minimize the risk of creating freespans during cable lay, touch down monitoring was carried out using the trencher as inspection ROV.

Characteristics of the Cables:
Type of Cable : HVAC Cable
Guernsey-Jersey
HVAC Cable
Jersey-France
Fiber Optic Cable
Total Length : 27.5 km 17.5 km 45.0 km
Outer Diameter : 185 mm 185 mm 50 mm
Weight (in air) : 77.1 kg/m 56.3 kg/m 7.6 kg/m
Min. Bend Rad. : 5.0 m 5.0 m 1.5m
Max. Tensile Load : 57 kN 57 kN 52 kN

In order to successfully complete the France - Jersey - Guernsey Power Link, Five Oceans Services utilized specialized cable equipment. The equipment utilized included, but was not limited to:

  • Cable loading equipment
  • Cable lay equipment
  • Cable trenching equipment

In addition to the above, dedicated support equipment such as high accurate positioning systems (DGPS and USBL), as well as typical inspection and monitoring equipment (Sea Eye ROV and Innovatum Ultra System) ensured that a high level of confidence was achieved and maintained throughout the project.