In order to ensure that sufficient electric power is available on the
the Grand Cayman Islands, a power cable link within the North Sound Bay
was installed in 2001. ABB High Voltage Cable AB was awarded the supply
and installation contract by Caribbean Utility Company. Five Oceans Services
carried out the installation works of this turn key project within the
required installation timeframe. The installation comprised the installation of 2 High Voltage Alternating Current (HVAC) cables. Both cables were successfully installed in an average water depth of 3.5 m. The total length of the cable route was 11 km. Water depths along the route varied between 1 and 6 meters. Since the North sound is an environmentally very sensitive and shallow, a whole new approach to cable installation had to be applied. A barge consisting out of 29 Flexifloat pontoons was engineered in the Netherlands and shipped to the Cayman’s. Both cables had to be landed through mangrove swamp, which was successfully performed by floating 800m of cable utilizing Sea Serpent and pull the cable in by means of a shallow water tug and by hand in the very shallow area's.
In order to successfully complete the project, Five Oceans Services utilized specialized cable installation equipment including, but not limited to:
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||